Surveying
Please note that the measurements are scheduled on a route approximately 8 weeks in advance.
Are the recess dimensions final?;
- Has the old window frame been removed and the rough opening finished according to the specification (see technical details), if necessary;
- Is the finished floor (such as tile, wood, PVC) laid;
- After being measured, is no plastering, sanding, etc. done anymore?.
Should we be on site and unable to take measurements, we will be obliged to charge the surveying costs.
Any cancellation must be notified 7 working days in advance, otherwise we will also be forced to charge the measuring costs.
Assembly
When we come to install...
- Are you responsible for covering the floor?;
- Are there any fragile/valuable items (e.g. vases, paintings) within a 5-metre radius of the installation location and along the walking route;
- Are there no children playing in the rooms where we have to work (possibly in consultation with fitters);
- (Prior to the installation of window units) The client shall ensure that there are no skirting boards on the walls and/or ceiling at the installation site (unless expressly agreed otherwise). Should any skirting boards present still need to be removed, Steellife cannot be held liable for any damage resulting from the removal of the skirting boards;
- Are we aware that we may possibly not be allowed to drill into floors, walls or columns;
- Are we informed of any (glass) damage before or during installation, otherwise we cannot accept responsibility for this;
- Do we not carry out sealant and painting work, as well as the repair of minor damage to wall or ceiling plasterwork that is unavoidable during installation (in exceptional cases), with any skirting boards being removed or cut into, depending on the situation. Furthermore, we are also not responsible for any damage that occurs in the event of hitting pipes (water, electricity, etc.) by drilling into floors, walls and ceilings.
- We do not provide the silicone sealing, not even for shower walls;
- We deliver broom clean, we do not clean the walls installed by us (window cleaning) due to drying time;
- Is the space in which work is to be carried out lit, wind and watertight, and if this is not possible, has this been reported in advance,
- Has the situation been implemented as described above, otherwise we cannot carry out the installation and/or we will not provide a warranty on this?,
- Vertical transport/crane costs are not included in the quote, unless otherwise agreed.
Should we arrive on site and be unable to carry out the installation, we shall be obliged to charge for the fitting costs nonetheless.
Any cancellation must be notified 7 working days in advance, otherwise we will also be obliged to charge the installation costs.
Technical conditions
Below you will find the technical conditions per product. If in doubt, please contact us by phone.
- Fixed wall;
The ceiling must be firmly screwable; this can be concrete, stone or wood;
– For plasterboard, we advise installing at least 2×18 mm plywood behind the plasterboard, otherwise we cannot install the walls;
– For steel beams, we advise that they are clad with 2×18 mm plywood;
– We must be able to drill at least 4 cm into the ceiling, and no pipes may run within this distance;
– The floor must also be sturdy and not be able to subside, and we must also be able to drill at least 10 mm into the floor;
– If underfloor heating is milled in or embedded in new construction, a 25 cm strip under the fixed wall must be kept free of pipes; no other pipes may be located here either;
– The walls must be finished as if no partition wall is going in;
– All panels can have a size/squareness tolerance of 4 mm. - Hinged door(s);
The ceiling and walls must be firmly screwable; this can be concrete, stone or wood;
– In the case of plasterboard, we advise installing at least 2×18 mm plywood behind the plasterboard, otherwise we cannot mount the hinged doors;
– For steel beams, we advise that they are clad with 2×18 mm plywood;
- We must be able to drill at least 4 cm into the ceiling, and no pipes may run within this distance;
– The floor must also be sturdy, and with a double hinge door we must be able to drill at least 10mm into the floor. (With a single hinge door we do not need to drill into the floor.) So existing underfloor heating is not a problem provided we can drill 10 mm (also applies to tile or glued flooring).
– Should drilling into the floor with a double-action hinge door not be possible, an alternative solution can be discussed if necessary.
– If you still need to mill or pour the underfloor heating, a 20cm x 20cm section must be kept clear at the location of the centre of the two doors for the flush bolt of the passive door. Near the side panels, the width of the sidelight must be kept free of underfloor heating with a strip width of 25cm.
– The walls must be finished, as if no door is to be fitted in them;
– Please ensure that there are no smoke detectors, lights and/or ventilation points in the arcs of the doors, nor any wall sockets or switches where the doors/panels are located;
– If there are wooden skirting boards, we can cut them to size. The skirting boards must not be thicker than 2 cm. The cut edges must be finished by a painter; this is not carried out by Steellife;
– In the case of stone skirting boards and/or floor tiles, we are not responsible for any cracking thereof due to poor bonding. We do not cut stone skirting boards.
– All panels can have a size/squareness tolerance of 4 mm. - Pivot door(s);
– The ceiling must be suitable for secure screw fixing; this can be concrete, stone or wood;
– For plasterboard, we recommend installing at least 2×18 mm plywood behind the plasterboard;
– For steel beams, we advise that they are clad with 2×18 mm plywood;
– We must be able to drill at least 4 cm into the ceiling, and no pipes may run within this distance;
– The floor must be solid, and we must also be able to drill at least 10 mm into the floor;
– Existing underfloor heating is not a problem provided we can drill 10 mm (also applies to tiled or glued floors);
– If underfloor heating still needs to be milled or poured, a 25×25 cm section of the wall at the pivot point must be kept free of pipes; no other pipes may be located here either (if the pivot point of the door has been moved, a larger area must be kept clear, please contact us about this);
– Under a sidelight, the width of the sidelight + 25cm from the sidelight must be kept free of pipes with a strip width of 25 cm;
– Walls and ceilings must be finished as straight and level as possible for the best final result to limit the chance of gaps;
– The walls must be finished as though no door is going in;
– Please ensure that there are no smoke detectors, lights and/or ventilation points in the arcs of the doors, nor any wall sockets or switches where the doors/panels are located;
– If there are skirting boards, we will need to cut a section out of them. To avoid this, please do not use skirting boards or self-adhesive skirting boards (which lie flat on the floor). The cut edges must be finished by a painter; this is not carried out by Steellife;
– For stone skirting boards and/or floor tiles, we are not responsible for any cracking caused by poor bonding. We do not cut stone skirting boards;
– All panels can have a size/squareness tolerance of 4 mm. - Sliding door(s);
– If a sliding door needs to be slid into the wall, please get in touch; the following points also apply to this situation;
With a pocket sliding door, the flooring must be laid 10 cm continuously between the walls in order to install the guide block.
– The ceiling must be securely screwable, which can be concrete, stone or wood, and the entire rail must be capable of being properly secured;
– When using plasterboard, we advise installing a minimum of 2×18 mm plywood behind the plasterboard, otherwise we cannot install the sliding door and track;
– For steel beams, we advise that they are clad with 2×18 mm plywood;
– We must be able to drill at least 4 cm into the ceiling, and no pipes may run within this distance;
– The floor must be solid, and we must also be able to drill at least 10 mm into the floor;
– Existing underfloor heating is not a problem provided we can drill 10 mm (also applies to tiled or glued floors);
– If underfloor heating still needs to be milled in or poured, a 25×25 cm section of the wall (underneath the sliding door) at the location of the guide block must be kept free of pipes; no other pipes may be located here either;
– Below a side window, the width of the side window + 25 cm from the wall must be kept clear of pipes with a strip width of 25 cm;
– Walls and ceilings must be finished as straight and level as possible for the best end result and to minimise gaps;
– The walls must be finished as if no door is going to be in them;
– Please ensure that there are no smoke detectors, lights and/or air supply points in the directions of movement, nor any sockets or switches on the walls where the doors/panels are located;
– For skirting boards, we need to cut a piece out of them; to avoid this, you can choose not to use a skirting board or to use an adhesive strip (flat on the floor). The sawn edges must be finished by a painter, this is not something we do. In the case of stone skirting boards, we are not responsible for them cracking due to poor adhesion; the same applies to floor tiles;
– All panels can have a size/squareness tolerance of 4 mm. - Trap;
– Good fixing materials on the floor where the stairs meet it. This can be concrete, stone or wood;
-Mirror piece can consist of 18 mm plywood (if necessary, pack out the space between the mirror piece and the concrete floor with wood or cement);
– For steel beams, we recommend that they be clad with 3×18 mm plywood or a timber beam at least 50 mm thick. Installation in steel is not included in the quote;
– At the location of the stair stringer and stair handrail on the wall, good fixing material to ensure secure attachment to the wall;
– For plasterboard walls, we advise installing a minimum of 2×18 mm plywood/OSB behind the plasterboard, otherwise we cannot attach the handrail or staircase stringer to the wall;
– The floor must also be sturdy and not be able to subside;
– If underfloor heating is milled in or poured in during new construction, underfloor heating must be kept clear on the floor beneath the first step, across the entire width of the stairs. No other pipes may be located here either;
– Please note that underfloor heating and other piping near balustrades are kept 25 cm clear of the stairwell. This is to ensure balusters can be mounted securely;
– Ensure that there are no pipes located at the position of the stair stringer and stair railing;
– The walls and stairwell must be finished as though no staircase is going to be installed;
– Ensure that the headroom at the stairs is always at least 2.30;
– Ensure that there are no lights, sockets or switches located near the stairs/stringer/handrail;
– If there are wooden skirting boards, we can cut them to size. The cut edges must be finished by a painter; this is not carried out by Steellife;
– For stone skirting boards and/or floor tiles, we are not responsible for any cracking caused by poor bonding. We do not cut stone skirting boards;
– We can measure the stairs once the cement screed floor has been laid, the stairwell/well opening is ready and the walls have been plastered/finished;
– Provisional provisions for crane costs are not included in the quote, unless otherwise agreed;
– Strip balustrades do not comply with the building regulations. The client has been informed about this. - Handrails;
– Good fixing materials to which the bannister is attached. This can be concrete, stone or wood;
– For plasterboard walls, we advise installing at least 2×18 mm plywood/OSB behind the plasterboard, otherwise we cannot attach the handrail to the wall;
– Ensure that there are no pipes located where the handrail is to be fitted;
– The walls must be finished as if no handrail is going to be fitted, unless otherwise agreed;
– Any current handrails and fixing points must be removed by the customer and made good;
– Please note that there are no lights, power sockets or switches located near the stair railing;
– If there are wooden skirting boards, we can cut them to size. The cut edges must be finished by a painter; this is not carried out by Steellife;
- Curved stair handrails can be manufactured based on the existing handrail including the current fixing points;
– Important information: please consult Steellife regarding the connections and details of the LED handrail. - Balustrades;
– Good fixing materials on the floor where the balustrade will be placed on or against. This can be concrete, stone or wood;
– Mirror piece can consist of 18 mm plywood (if necessary, pack out the space between the mirror piece and concrete floor with wood or cement);
– For steel beams, we recommend that they be clad with 3×18 mm plywood or a timber beam at least 50 mm thick. Installation in steel is not included in the quote;
– For plasterboard walls, we advise installing a minimum of 2×18 mm plywood/OSB behind the plasterboard, otherwise we cannot attach the balustrade to the wall;
– The floor must also be sturdy and not be able to subside;
– Please note that underfloor heating and other piping near balustrades are kept 25 cm clear of the stairwell. This is to ensure balusters can be mounted securely;
– The walls and stairwell must be finished as though no balustrade will be fitted on or against them;
– Any current balustrades and fixing points must be removed by the client and made good;
– Please note that there are no lights, sockets or switches located at the balustrade;
– If there are wooden skirting boards, we can cut them to size. The cut edges must be finished by a painter; this is not carried out by Steellife;
– For stone skirting boards and/or floor tiles, we are not responsible for any cracking caused by poor bonding. We do not cut stone skirting boards;
– We can measure up the balustrade once the cement screed floor has been laid, the stairwell/opening is ready and the walls have been plastered/finished;
– Provisional provisions for crane costs are not included in the quote, unless otherwise agreed;
– Strip balustrades do not comply with the building regulations. The client has been informed about this. - External window frames;
– The perimeter sub-frame must be 20 mm thick (from the installation side);
– The sub-frame (including the joints) must be waterproof and sufficiently treated to prevent wood rot. We recommend covering 20 plywood with EPDM and making the sub-sill out of hardstone;
– There must be no pipes located behind the subframe;
– The subframe/structural connection must be watertight and the connection between the stop profile and the subframe must be water-resistant, otherwise water may enter the structural connection (and therefore onto the steel frame). Please ensure that the reveal depth is sufficient and take account of the wind and rain direction;
– The head and sill of the sub-frame must be rigid and incapable of sagging;
– All steel exterior window frames are executed with wet glazing. We only seal the outside between steel and glass. We do not provide finishing and (any) sealing between steel and sub-frame/wall and on the inside;
– Important is sealing on the inside between the steel frame and sub-frame. This sealing must be airtight and watertight;
– Important is sealing between sub-frame and inner leaf. This sealing must be airtight. Sub-frame must be anchored to inner leaf. - Other types;
– Important information on request. Please get in touch if any of the above is unclear. Ask your question below